Financial Compensation for Category (C) Minerals

The holder of the exploitation license is required to pay the financial compensation for each ton of extracted ore under the license, for the quantities exploited from the minerals and ores based on the specified rate, while considering the minimum mining capacity in tons according to the area of the license site.

Therefore, the investor must pay the financial compensation based on the minimum specified capacity, even if the total exploited quantity is less than the set limit.

 

 

#Category (C) OresCategory (C) Ores
Minimum Mining Capacity in Tons Based on the Site Area
0 to 0.25 km²Greater than 0.25 to 0.5 km²Greater than 0.5 to 0.75 km²Greater than 0.75 to 1 km²
1

Gravel: (Any rock suitable for exploitation as gravel)

(Aggregates: (any rock suitable to be crushed

0,67200,000300,000400,000500,000
2كسر رخام (Crushed Marble)3,540,00080,000160,000200,000
3سكوريا (Scoria)3,540,00080,000160,000200,000
4طين (Clay)2,2540,00060,00090,000135,000
5

أحجار الزينة – (الجرانيت، الجابرو، النيس)

Dimension Stone (Granite, Gabro, gneiss)

99,00018,00032,00045,000
6بازلت (Basalt)345,00067,500100,000150,000
7أحجار الزينة - (شيست وفيليت)
  Dimension Stone ( schist & Phyllite)
2,2530,00045,00067,500100,000
8أحجار الزينة - (رخام)
Dimension Stone (Marble)
4,212,00024,00042,00060,000
9أحجار الزينة:– دلومايت – حجر جيري
(Dimension Stone - (limestone, dolomite
2,820,00040,00070,000100,000
10أحجار الزينة: حجر رملي
Dimension Stone (sandstone)
1,320,00040,00070,000100,000
11الرمل والحصى (Sand and Grave)0,53130,000195,000260,000325,000
12

رمل السيلكا (منخفض النسبة)

(Low grade Silica Sand  SiO𝟤 < 𝟫𝟧%)

550,00075,000112,000168,000
13مواد ردميات (Sub-base Materials)415,00022,50033,00050,000